Business Consulting reviews and results

Real feedback from companies we have worked with. Every testimonial and case study appears here with the client's written permission.

What our clients say

These are direct quotes, lightly edited for length. We can provide references on request.

★★★★★
We brought Resolve in to look at our warehouse process. Within three weeks they had mapped every step, found two bottlenecks we had been working around for years, and given us a redesign that cut packing time by 22%. The fixed-fee model meant no budget anxiety.
Avatar
Derek Muir
Operations director, Highland Distribution Ltd
★★★★★
I was sceptical about hiring consultants. Previous experiences left me with expensive slide decks and no change. Fiona spent the first two days just listening to my team. By day ten she had a cash-flow model that finally made sense to me, and she trained my bookkeeper to maintain it. That was eighteen months ago and we still use it every week.
Avatar
Sandra Beattie
Owner, Beattie Joinery
★★★★☆
Callum coached me through the transition from a 15-person company to a 40-person one. He was blunt when I needed it and patient when I was slow to change habits. The only reason I give four stars instead of five is that I wish we had started six months earlier.
Avatar
Ravi Anand
Managing director, Anand Tech Solutions
★★★★★
Priya helped us figure out which European markets were realistic for our product range and which were a waste of time. Her pricing analysis saved us from under-cutting ourselves in Germany. We entered three markets in 2023 and all three are profitable already.
Avatar
Eilidh Torrance
Commercial manager, Glen Harvest Foods
★★★★★
During Covid we had eight weeks of cash left. Graham built a scenario model overnight that showed us exactly which costs to cut and which contracts to renegotiate. We kept every employee. I still find it hard to believe we came that close to going under and came out the other side stronger.
Avatar
Lorna Galbraith
CEO, Clyde Engineering Services
★★★★★
We have used Resolve three times now. First for a process audit, then for a pricing review, and most recently for leadership coaching. Each time the work was specific, practical and finished on time. I recommend them to anyone who asks.
Avatar
Niall Buchanan
Director, Buchanan Property Management
87%

Client retention rate (hired us more than once)

140+

Projects completed since 2016

14 yrs

Average industry experience per consultant

96%

Projects delivered on or under budget

Case studies

Detailed examples of recent engagements. Numbers are real; client names are used with permission.

Food production facility interior
Growth strategy

Glen Harvest Foods: opening three export markets in twelve months

Glen Harvest makes premium oat-based snacks in Stirlingshire. They had strong UK supermarket placement but flat revenue growth. The owner wanted to export but had no idea which countries to target or how to price for different retail environments.

Priya Sharma spent two weeks analysing trade data, tariff structures and competitor pricing in eight candidate markets. She narrowed the list to Germany, the Netherlands and Sweden, built a pricing model for each, and introduced the client to two distribution partners she had worked with on a previous project. Within twelve months, export revenue accounted for 27% of total sales.

27%
Revenue increase in year one
3
New markets entered
14 weeks
From diagnostic to first export shipment
Distribution warehouse with shelving and workers
Operational restructuring

Highland Distribution: cutting packing time by 22%

Highland Distribution runs a 4,000-square-metre warehouse near Inverness, shipping around 1,200 parcels a day. Their operations director, Derek Muir, noticed that overtime costs had risen 35% in a single year even though order volumes were roughly flat.

Fiona Caldwell spent ten days on site, shadowing packing staff and mapping every step from order receipt to dispatch. She identified two bottlenecks: a label-printing queue caused by a single shared printer, and a picking route that sent staff back and forth across the warehouse instead of moving in a loop. The fix cost £4,200 in equipment and signage. Packing time per parcel dropped 22%, and overtime fell back to its previous level within two months.

22%
Reduction in packing time per parcel
£4,200
Total implementation cost
2 months
To return overtime to normal levels
Engineering workshop with CNC machines and team
Financial planning

Clyde Engineering Services: surviving a cash-flow crisis

In April 2020, Clyde Engineering had eight weeks of cash reserves and three major contracts on hold. CEO Lorna Galbraith called us on a Friday afternoon. Graham Petrie built a scenario model over the weekend that mapped out four possible paths: full shutdown, partial furlough, contract renegotiation, or a combination of the last two.

The model showed that renegotiating payment terms with two suppliers and furloughing six of 28 staff would extend the runway to five months, enough time for the paused contracts to restart. Lorna chose that path. All six furloughed employees returned by September. The company finished 2020 with a small profit.

0
Permanent redundancies
5 months
Extended cash runway

Want results like these?

Every project starts with a free, no-obligation conversation. Tell us what you are dealing with and we will let you know honestly whether we can help.

Get in touch